Public procurement thresholds 2026-2027

A notice is published on TED when the contract reaches the EU publication thresholds. The amounts below are those the European Commission publishes for Directive 2014/24/EU, years 2026-2027.

The path

  1. Read the amount
  2. See the buyer type
  3. Compare it with the published threshold
  4. Read the cited text

Keep in mind

  • Public facts

    The page repeats what was published. A missing field is marked.

  • Read only

    The page does not say who will be selected.

  • The document governs

    The published notice and the published specification stay the source.

Commission Delegated Regulation (EU) 2025/2152 of 22 October 2025.

Calculate: does your contract cross a threshold?

Pick the type of contract, the buyer and the total estimated value excl. VAT, including options, renewals and every lot. The calculation runs in your browser with the 2026-2027 thresholds.

Every threshold, with the official sources

  • €5 404 000 — Works and subsidised works, central and sub-central authorities
  • €750 000 — Social and other specific services listed in Annex XIV
  • €216 000 — Subsidised services of central government authorities
  • €140 000 — Other services, design contests and supplies of central authorities outside defence, and defence supplies listed in Annex III
  • €216 000 — Defence supplies that are not listed in Annex III
  • €216 000 — Other services, design contests, subsidised services and supplies of sub-central contracting authorities

The concessions, utilities and defence directives have their own amounts on the same official page.

Belgian contracts below these thresholds are published on e-Procurement. AOEX now reads them through the BOSA e-Procurement API: each notice has its own aoex page, with its public documents and a link to the official source.

Official thresholds page, European Commission.

Belgian thresholds below the EU thresholds (2026-2027)

Below the EU thresholds, Belgian law sets its own amounts excluding VAT. They decide whether a notice is published, and so whether you can read it on TED, on e-Procurement, or not at all. Classical-sector amounts.

  • < €30 000 — Low-value contract (Article 92 of the Law of 17 June 2016): no notice is published, the buyer consults directly, and an accepted invoice can be enough.
  • < €140 000 — Negotiated procedure without prior publication allowed (Article 42(1)(1)(a) of the Law). No notice: only operators invited through e-Procurement may bid. €143,000 in 2024-2025.
  • ≥ €140 000 — Belgian publication required in the Bulletin des Adjudications (e-Procurement), up to the EU threshold.
  • < €750 000 — Works: direct negotiated procedure with prior publication allowed. Supplies and services: allowed below the EU threshold (€216,000).

Sources: the “Les seuils en matière de marchés publics” sheet (marchespublics.wallonie.be) and the Union of Walloon Cities and Municipalities. UVCW

A published notice? The bid kit reads its documents and dictates each field.